Construction Update: Palm Shores

Palm Shores, Palm Beach

Construction at Palm Shores is powering ahead, with major milestones already achieved since our last update. Demolition is complete, piling and basement retention are finished, the seawall has been fully rebuilt, and the ground-level “donut” slab has now been poured. The site has transformed dramatically, and momentum is stronger than ever.

Following a hugely successful sales campaign, Palm Shores is now down to the very last Half Floor Apartment – a testament to 5Point’s quality of developments.

Progress Highlights

  • Piling commenced and completed.
  • Ground-level “donut slab” poured, now forming the platform for basement construction.
  • Bulk excavation underway alongside commissioning of the dewatering system to stabilise ground conditions.
  • Raft slab pour planned for early 2026.

  • Forming and pouring of the Basement 3 slab.
  • Tower crane installation.
  • Both milestones targeted for completion by the end of February 2026.

Default

Default

Default

View the full Construction Update via our YouTube Channel

Default
Default

Construction Update: Jardinia

Jardinia, Yeronga

Construction is well underway at Jardinia, our 87-unit residential project in the heart of Yeronga. With the structural basement and civil works complete, pouring of Level 1 is now underway—an exciting milestone as the building begins to take its full shape.

Set across four levels, Jardinia will offer a range of 1–3 bedroom apartments, complemented by rooftop amenities including a pool, sauna, gym, and private dining, as well as retail spaces on the ground floor. The design reflects a vision for a vibrant, connected community, bringing modern urban living to the heart of Yeronga.

The site is buzzing with activity as subcontractors and suppliers push forward to the next phase, bringing Jardinia ever closer to completion. Each week marks tangible progress, shaping a development that promises quality, lifestyle, and a sense of place for future residents.

Shottery Rooftop Communal Bonus Vignette
Shottery Devon St Corner Exterior Final
Shottery Porte Cochere Final

View the full Construction Update via our YouTube Channel

Construction Update: Aire

Aire, Newstead

Momentum is building at Aire, and it’s all thanks to the incredible dedication of our 5Point team, along with our trusted suppliers and contractors on site.

Excavation is complete, and the Basement 3 slab has been poured. With the ground floor pour planned for April and top out anticipated in December, Aire is quickly taking shape-set to make its mark on the Newstead skyline.

A huge thank you to everyone contributing to this exciting journey.

More milestones to come. Stay tuned!

Default
Default

View the full Construction Update via our YouTube Channel

Palm Shores: Sod Turning

Palm Shores has Broken Ground

A new chapter begins at 171–173 Jefferson Lane.

The sod is officially turned on 5Point’s latest Gold Coast development and continuing our presence on Palm Beach absolute beachfront.

Palm Shores will rise as a collection of 16 luxury residences across 9 levels, encompassing two private beach front homes, crowned with dual level penthouses. With 60 percent sold in just four weeks – before we had officially launched, momentum is real and premium coastal living is clearly resonating.